The building plan has been prepared by Mrs Seane Dipotontro - Architect and Ir Bambang Aditjandra – Engineer (free of charge)

The total build up area is approximately 36 meters by 33 meters.
- A to F are class rooms (6 class rooms)
- G & H are childrens' toilets and wash area
(12 toilets and 12 wash basins)
- I is the childrens' play and activity room
- J is the hall
- K is the childrens' change room
- L is the teachers' staff room
- M is the teachers' office
- N is the Principal room
- O, P, Q and R are the pantry, storage, kitchen and library.
The total of cost of the building (of bricks and tiles) was estimated to be US $150,000. As of January 2010, the estimated cost has doubled to US $300,000 due to increase in building materials prices.